Construction Photos - October 2008
These photos where taken the week of 13 October 2008.
Photo 1: An existing gas line is being moved to outside the boundaries of the new gym location at Brookfield East High School.

Photo 2: Drilling for the gas line installation. This underground technique allows the parking lot to continue to be used with very little disruption.

Photo 3: With the modifications to the intersection of Lilly and Burleigh came turning lanes and wider entrances to the Brookfield East parking lot. Students and parents have noticed that congestion entering and leaving the lots is reduced.

Photo 4: A new parking lot is being constructed in the area just in front of Brookfield Central High School. The sundial and flagpoles in the background are being preserved. This new parking will replace spaces lost in back of the school where the new gym will be located.

Photo 5: A retention pond is being dug in the area just behind the house located to the west of Brookfield Central High School on Gebhardt Road. The house will be razed soon. This pond will hold water that collects from the new parking lot and feeds it at a controlled rate into the city stormwater system.