Elmbrook School's Facilities Projects

Inside the BEHS Field House June 2009
BCHS Construction May 2009
BEHS Construction May 2009
BEHS Construction Photos Feb 2009
BCHS Construction Photos - Feb 2009
Brookfield Central Students Involved with Construction - November 2008

Brookfield Central's Construction 1006 class, taught by Anthony Christian, constructed the foundation for the new sign in front of Brookfield Central.

Construction Photos - November 2008

Room 140 at Brookfield East was demolished to make room for construction of the new entrance and lobby on the south side of the school.

 

 

The main sewer line at Brookfield East is being moved to a location beyond the boundaries of the new building construction.

 

Concrete pipes used to construct manholes along the new sewer line at Brookfield East.

 

Earthwork around Brookfield Central to provide proper drainage and control of storm water.

 

New roadway around to the east of Brookfield Central for fire department access.

 

Landscaping is all that is left of the home that was on school property southwest of Brookfield Central.

 

The new parking lot in front of Brookfield Central opened on November 19 and was first used for the Senior Citizen Thanksgiving Dinner.  Students began parking in the lot November 20.

 

The retention pond west of the new parking lot is already doing its job of holding runoff.

Brookfield East Groundbreaking Ceremony - October 9

 

Brookfield East Principal Brett Bowers, Superintendent Dr. Matt Gibson, Board of Education President Meg Wartman, City of Brookfield Mayor Jeff Speaker

 

Former Board Member Patrick Murphy,  Superintendent Dr. Matt Gibson, Board of Education Members Gary Jones, Meg Wartman, Glen Allgaier, Robert Ziegler

 

Brookfield East Principal Brett Bowers, Student Class Presidents, Athletic & Activities Director Corey Golla

 

High School Facilities Steering Team & E Progress Committee: Roger Johnson, Molly Steffen, Richard Brunner, Dorothy Smaglick, Jim Nortman, Meg Wartman

 

Brookfield East Athletic & Activities Director Corey Golla, Board of Education President Meg Wartman, Superintendent Dr. Matt Gibson, Principal Brett Bowers

Brookfield Central Groundbreaking Ceremony - October 9

 

Brookfield Central Principal Don LaBonte, Superintendent Dr. Matt Gibson, Board of Education President Meg Wartman, City of Brookfield Mayor Jeff Speaker, Senator Ted Kanavas

 

 

Brookfield Alderman Renee Lowerr, Mayor Jeff Speaker, Alderman Scott Berg

 

Brookfield Central Principal Don LaBonte, Student Class Officers, Athletic & Activities Director Dan Anderson

 

 

Board of Education Member Robert Ziegler, Dr. Matt Gibson, Board of Education Members Gary Jones, Meg Wartman, Glen Allgaier, Former Board Member Patrick Murphy

 

High School Facilities Steering Team and E Progress Committee Members: Roger Johnson, Dorothy Smaglick, Molly Steffen, Meg Wartman, Mary Altschaefl, Richard Brunner

 

 

Construction Photos - October 2008

These photos where taken the week of 13 October 2008.

Photo 1: An existing gas line is being moved to outside the boundaries of the new gym location at Brookfield East High School.

 

Photo 2: Drilling for the gas line installation.  This underground technique allows the parking lot to continue to be used with very little disruption.

 

Photo 3: With the modifications to the intersection of Lilly and Burleigh came turning lanes and wider entrances to the Brookfield East parking lot.  Students and parents have noticed that congestion entering and leaving the lots is reduced.

 

Photo 4: A new parking lot is being constructed in the area just in front of Brookfield Central High School.  The sundial and flagpoles in the background are being preserved.  This new parking will replace spaces lost in back of the school where the new gym will be located.

 

Photo 5: A retention pond is being dug in the area just behind the house located to the west of Brookfield Central High School on Gebhardt Road.  The house will be razed soon.  This pond will hold water that collects from the new parking lot and feeds it at a controlled rate into the city stormwater system.

 

 

 

Construction to begin at Brookfield Central
Earthmoving is projected to begin at the end of September / beginning of October at Brookfield Central High School to prepare for the front parking lot.  The rear lot will remain open until the front lot is construced with preliminary surfacing.  When the front lot opens, much of the rear lot will be closed to allow for construction of the additional gym space.  No loss of student parking spaces is projected.
 
High School Building Committee Minutes - 7/22/2008

High School Comm - 7-22-08 Minutes.pdf

Posted: Aug 26 2008, 12:43 PM by admin
Filed under:
High School Building Committee Minutes - 7/15/2008

High School Comm - 7-15-08 Minutes.pdf

Posted: Aug 26 2008, 12:42 PM by admin
Filed under:
High School Building Committee Minutes - 7/8/2008

High School Comm - 7-8-08 Minutes.pdf

Posted: Aug 26 2008, 12:41 PM by admin
Filed under:
Construction Project Overviews Released

Brookfield Central High School Arial Gray.pdf 

Brookfield East High School Arial Gray.pdf

 